Know the cutting, those rough room inspection

Although many users choose hardcover rooms today, some users still like to decorate themselves according to their wishes. Then the rough room is a good choice. Even if the rough can not be relaxed, it is necessary to play the spirit of 120,000 points to inspect the house.
Everything is difficult at the beginning. In the rough room inspection room, you must first remember to verify the authenticity of the completed construction record card, and check the counterparty's "Completion Acceptance Record Form". Also look at the three books, a certificate, a table, "Construction Engineering Quality Certification", "House Use Instruction", "Residential Quality Assurance Certificate", "Comprehensive Acceptance Certificate of Real Estate Development and Construction Project Completion," and "Architectural Completion Acceptance Record Form." In addition, the area of ​​the purchase contract should be controlled according to the actual area measurement report data (the official seal of the surveying and mapping team).
Inspection details 1, check the attachment of the purchase contract and supporting facilities
2. Net area measurement, bay depth and net height measurement
3, floor hollowing, cracks, sand inspection
4. Wall emptying, cracks, cracks, explosions, flatness, yin and yang angle inspection
5, roof inspection
6, door, window installation quality and accessories inspection
7, conduct leak test
8, circuit insulation, grounding detection
9, to the installation of drainage quality inspection
10. Detection of other detailed structures
Inspection of strong and weak electricity
1, first check the installation of the meter, whether the meter specifications meet the requirements, and record the degree of the start of the meter 2, and then check the distribution box box accessories are complete, set aside the number of empty open 3. Check whether the indoor lighting and socket power are normal and whether the wiring is reasonable. 4. Check whether the security system is consistent with the agreed delivery standard in the contract.
Check the drainage system 1. Check the installation of the water meter. Check whether the joints before and after the water meter are leaky. Record the water meter's reading 2 and test the water pressure to see if the water pressure is too large or too small 3. Check the upstairs Whether there is leakage in the drainage pipe 4. Check whether the number of water supply points is consistent with the contract attachment. 5. Check whether the drainage pipes of the kitchen, bathroom, and balcony are complete or unblocked. 6. Check whether the kitchen and toilet drainage risers are set separately.
Wall 1、Inspect the wall surface for large area emptying phenomenon and whether there are obvious cracks 2、Check whether the flatness and the yin and yang angle are founder 3、Check whether the external wall has insulation measures according to relevant national requirements.
Ground 1, check the flatness, level 2, check whether there is a large area empty drum phenomenon 3, check for obvious cracks, sanding phenomenon
Kitchen 1 Check whether the size of the door opening and the ventilation opening area meet the standards. 2 Check whether the gas pipeline and gas meter are in place. 3 Check whether the drain pipe is installed with a fire ring. 4. Check the flue hole and check valve. 5. Check the quality of the ceiling and the floor.
WC 1, check whether the size of the door hole meets the requirements 2, check whether the drain pipe is equipped with a firestop ring 3, check the reserved exhaust passage, check whether the opening and check valve is complete, 4. Check the leakage condition of the toilet floor 5. Check the quality of the ceiling
There are many reasons for delaying the submission of PS. It is acceptable to postpone months if it is a general engineering problem. However, if it is because of the problem of the developer's capital chain, it cannot be started. It is recommended that the owner promptly negotiate with the developer and check out.

Home inspection decoration contract construction contract

Cree Led Grow Light

Cree LED Grow Light can save about 30% cost in the application,mainly lie in LED package cost,light engine production costs and the secondary light distributioncosts, which is great significance for applications and promotion of semiconductor lighting. We could also DIY the led ratio(wavelength ratio) which imitate the natural sun spectrum to help your plants grow in a very natural type of atmosphere, Absolutely, we are the very original and professional OEM/ODM factory, our Cree LED Grow Light have the great cost performance with the new integration technology being used for mass production, partners around the world keep telling us how amazed at the increase in output and the decrease in the energy bill.


Applications

Our professional full spectrum Cree LED grow light are suitable for all the indoor plants and good for seeding, growth,flowering and fruiting stages of plants, increasing the harvest and Saving energy.


Key Features

Upgraded Epistar chips,High Lumen,High penetration.
Zener Diode protection Each LED,one LED Out,other LEDs still work.
High quality material,Listed Certification Wires,Heatproof Tube,Zero-Risk to catch fire.
Efficient Full spectrum Special rations of Blue,Red and White for both blooming &fruiting stages.
Adopting isolated power supply,safe&easy to maintain&long life time.
Aluminum heat-conducting plate+high quality brand fans,efficient heat dissipation.
IR LED involved,it is not as bright as other leds,But promote the yield.

Plug with listed certificate safe to use.


Item Display


Cree LED Grow Light


The Plug you can choose

Cree LED Grow Light


Full Spectrum Cree LED Grow Light PAR Value

Cree LED Grow Light

Our Ageing Test

Cree LED Grow Light

Package

Cree LED Grow Light


Warnings:

1.lndoor use only.

2.To avoid being damaged,do not use water or drip irrigation while using.

3.Sunshine lighting time should be 12-18 hours.

4.While irradiating the plants,the height of led grow lamp is not less than 10 inches,low height will cause the destruction of plants.

5.Highly hang the lamp will weaken the energy and affect the growth cycle of the plants, so the lamp should not be hung too high.

6.While taking care of the plants, please spray the leaves and branches 2-3 times everyday,to ensure the the plants do not wrinkle a wither, and have no phenomenon of few fruit, and hard pericarp.


Warmly welcome to Visit our Factrory when you come to China.

CREE Chips LED Grow Light,CREE LED Grow Light,CREE Grow Light,CREE COB LED Grow Light

Shenzhen Phlizon Technology Co.,Ltd. , https://www.philizon.com