Model NO.: SC-2
Trademark: Sunrise
Specification: Produced Customized by drawing
Origin: China
HS Code: 9406000090
SUNRISE STEEL SANDWICH PANEL PREFABRICATED BUILDING SYSTEM
Â

Structure & Material of Sunrise Prefab House Main Body
Â
FAQ:
"GIVE PEOPLE A NEW HOME" Â
"GIVE THEM A NEW LIFE AND FUTURE"
"BUILD MORE AFFORDABLE AND COMFORTABLE HOUSES FOR PEOPLE"
========================================================================================
Â
Â
Could be built :
Prefabricated House / Prefab House / Modular House / Prefab Steel Building / Pre Engineered Building / Mobile House / Movable House / Prefabricated Home / Light Steel Frame Building / Villa / Apartment / Cabin / Office / School / Hotel / Warehouse / Workshop / Plant / Carport / Restaurant / Dormitory / Permanent Living House Project / Temporary Living House Project
Advantages
1.       Environmental Friendliness
2.       Less Time Consuming,
3.     Sturdy (Withstand Earthquakes And Tornadoes)Â
4.        Fast & Easy Construction, Saves Cost (Easy To Build And No Requirement For   Qualified Labor,
5. Â Â Â Â Pre Engineered Steel Frame
6. Â Â Â Â Excellent Thermal Performance
7. Â Â Â Â Weather And Excellent Fire Rating
8. Â Â Â Â Customized drawing and production: size, shape, room layout, room quantity, 1-2Â storeys for options
9. Â Â Â Â Tested And Approved By SGS And SARS Quality Assurance Company,
Prefabricated House / Prefab House / Modular House / Prefab Steel Building / Pre Engineered Building / Mobile House / Movable House / Prefabricated Home / Light Steel Frame Building / Villa / Apartment / Cabin / Office / School / Hotel / Warehouse / Workshop / Plant / Carport / Restaurant / Dormitory / Permanent Living House Project / Temporary Living House Project
Advantages
1.       Environmental Friendliness
2.       Less Time Consuming,
3.     Sturdy (Withstand Earthquakes And Tornadoes)Â
4.        Fast & Easy Construction, Saves Cost (Easy To Build And No Requirement For   Qualified Labor,
5. Â Â Â Â Pre Engineered Steel Frame
6. Â Â Â Â Excellent Thermal Performance
7. Â Â Â Â Weather And Excellent Fire Rating
8. Â Â Â Â Customized drawing and production: size, shape, room layout, room quantity, 1-2Â storeys for options
9. Â Â Â Â Tested And Approved By SGS And SARS Quality Assurance Company,
AGREEMENT CERTIFICATE SOUTH AFRICA
 (http://www.agrement.co.za)
 (http://www.agrement.co.za)

Structure & Material of Sunrise Prefab House Main Body
Â
External Wall Panel |
|
Internal Wall Panel | |
Roof Panel | Mainly similar as above wall panel, except the face is corrugated color steel panel for rain water easier flowing |
Door and Window Panel |
|
Truss & Purlin | Hot galvanized steel structure |
Foundation | Hot galvanized steel structure |
Attached pictures of above material:

Sunrise Prefab House Decoration & Facilities
Â

Sunrise Prefab House Decoration & Facilities
Â
House Decoration Material & Facility  (easily construct same as traditional way) |
External Wall | Directly using the color steel panel of wall panel, or could add PVC panel / Cement panel outside for different options |
Internal Wall | Directly using the color steel panel of wall panel, or could add Gypsum Board / Wallpaper / Wood Board for different options | |
Roof | Directly use the designed well corrugated color steel roof panel | |
Floor | Ceramic tiles/Wooden Floor/PVC roll | |
Ceiling | Gypsum board | |
Door | Security door/Wooden door/ Aluminum alloy door | |
Window | Aluminum alloy sliding window with double/single glass | |
Kitchen | Kitchen cabinet and kitchen ware | |
Bathroom | Shower room, toilet, glass and washing basin | |
Electric System | Construct same as traditional way | |
Water System | Construct same as traditional way |
Attached pictures of finished Sunrise Foam Cement Prefabricated House

Technical Parameters
Â

Technical Parameters
Â
Item | Technical Parameters |
Life Span | More than 20 years |
Roof Bearing Capacity | 50kg/m2 |
Second floor load capacity | 150kg/m2 |
Corridor Bearing Capacity | 2.0kg/m2 |
Earthquake Resistance | Richter 9 |
Fire Resistance | A1 level |
Temperature resistant | -50°C--50°C |
Snow Resistance | Snow pressure maximum 2.9KN/M2 as required |
Wind Resistance | 150km/h |
Â
Packing & Delivery

Certification
Â
Packing & Delivery

Certification
Â

FAQ:
- How long is your delivery time?
Generally in 15-20days, variable by house design and quantity.
- How about Shipping?
We ship the goods by 20' and 40HQ container Usually one 20 feet container can load about 50-60 square meters' house, 40HQ container can load about 120-140 square meters' house
- What's your Payment term?
50% deposit by TT in advance, 50% TT balance before loading; Â or 100% LC at sight
- Would you send engineer to help us to install the houses?
Yes, we will send our engineer to guide you to install the houses and train well your staffs.
- Would you help us to buy the facilities such as decoration material, water, electric & roof system material?
Yes, we will help you to buy all of them.
- How fast to install a house?
90% house main body material are finished well at factory in advance, so it would same time and labor cost largely. Normally our 5 workers as a team could finish the house main body structure of 100m2 foam cement house in 3 hours, please don't worry our engineer will help you to train your workers to install better and faster to save your cost.
Warmly welcome to contact us to get more information and visit our factory to talk the details face to face!
Â
 Warmly welcome to contact us to get more information and visit our factory to talk the details face to face!
Â
"GIVE PEOPLE A NEW HOME" Â
"GIVE THEM A NEW LIFE AND FUTURE"
"BUILD MORE AFFORDABLE AND COMFORTABLE HOUSES FOR PEOPLE"
========================================================================================
Â
Except the above Temporary Living Prefabricated Steel Sandwich Panel House, we also could produce the Permanent Living Prefabricated Foam Cement House, please check its details from the product groups at our " Made-in-China" website. Both of the two different house systems would satisfy your different house living purposes.

Â
 
Â
Â
Hyundai Parts,Machinery Spare Parts,Hyundai Aftermarket Parts,Dump Truck Spare Parts
JINING SHANTE SONGZHENG CONSTRUCTION MACHINERY CO.LTD , https://www.sdkomatsudozerparts.com