Autumn and winter home improvement acceptance seven key points

Autumn and winter home improvement seven major points

I. Hidden construction of hydropower lines

If the layout of the circuit is not standardized, it may leave security risks. Therefore, buyers should require the developer to provide circuit and water line diagrams for inspection. The main inspection content is whether the circuit has any changes, whether the circuit capacity is enough to load the electrical equipment, whether the power panel on the wall is adequate, whether the location is reasonable, whether the kitchen and toilet power supply is safe, whether there is leakage protection, and whether the short circuit will automatically trip. Whether some special lines have ground lines and so on. The main part of the water pipe includes whether the water is usually available and whether the sealing performance of the floor drain is good. In addition, the water pressure test is also required to see if there is leakage of the line joint.

Second, the brand model

Make a careful comparison of the brands, models, and colors of security doors, sanitary ware, decorative materials, lamps, kitchen cabinets, floor heating, and central air conditioners to see if there is a problem with the brand that was originally agreed in the purchase contract.

Third, the quality of decoration

Mainly related to the water circuit, mason, carpentry, installation, paint and other aspects. Mr. Wang, an inspector of the Shanghai Wuxie Inspection and Inspection Network, stated that doors and windows, wall paint, floor coverings, toilets, kitchens, and concealed works on the hydropower lines are relatively prone to problems. Therefore, “six views” should be implemented in this block.

Fourth, the wall

The most important thing is to check if there are any cracks. If there are any, it means that the cracks in the wall have not been repaired during the renovation. In addition, there is a phenomenon of color mixing at the junction between the roof and the wall. If it is separated from the bathroom, it is also necessary to check whether there is paint peeling. If it exists, it indicates that the wall seeps.

Fifth, floor

Look at whether the floor has warped, hollow, etc., especially for the composite floor, because the concrete floor can not completely find flat, so there will be uneven situation, we must pay attention to whether this situation is serious. In addition, the combination of the floor and the skirting board should be tight.

Six, doors and windows

Mainly inspect whether the close of the window is tight, whether the sliding is flexible, whether there is a feeling of soft bullets, in addition, the door, window stone, etc. should not have the trace of collision.

Seventh, kitchen equipment

The key contents of the kitchen inspection mainly include whether the cabinet doors can be normally opened or closed, whether there are empty drums on the wall tiles and floor tiles, and whether the water in the vegetable washing pool is unobstructed. For the bathroom, it is necessary to check whether the ceiling is leaky, whether the drainage pipes are open, whether the wall tiles are empty or not, and whether the wall between the bathroom and the bedroom or the living room has been waterproofed. Sanitary ware Such as the toilet, shower room, wash basin installation can not be ignored.

Doors and windows acceptance Water and electricity acceptance window paint Toilet cement Central air conditioning Living room wall color decoration Living room floor tile Cabinet cupboard door Kitchen door Bathroom tile Bathroom door Bathroom tile Color Integral bathroom Toilet Waterproof bathroom floor tile Floor tile ld Tile Kitchen tile Bedroom lamp Bedroom lamp

Submersible Electric Pump

Submersible Electric Pump,Large Submersible Electric Pumps,Electric Submersible Water Pump,Small Submersible Electric Pump

Shanxi Skysea Pump Lndustry Co.,Ltd. , https://www.skyseatianhai.com